Asheville, North Carolina

Bathrooms that feel like the quietest room in the house

Still Water builds bathrooms in Asheville and nothing else. One crew, one room, from the first measurement to the twelve-month check.

  • Bathrooms onlyNo kitchens, no additions
  • 9 days to 7 weeksTypical time on site
  • 12-month visitIncluded with every build
A calm, naturally lit bathroom with a freestanding tub beside a tall window

4.9 from 186 reviews

Ask us about your room

We reply the same working day, and the first conversation is a phone call.

Please enter your name.

Please add a phone number or email so we can reply.

Please choose a room type.

Thank you, that is with us.

Ines or Dermot will call you back the same working day. If it is urgent,(828) 555-0211 reaches the studio directly.

Full bathroom remodelsWalk-in showersTub-to-shower conversionsPrimary ensuitesAccessible bathroomsPowder roomsNorth AshevilleWest AshevilleBiltmore ForestBlack MountainHendersonvilleWeaverville

01

The six things that make a bathroom feel calm

None of them are expensive on their own. All of them are difficult to add later, which is why they go in while the walls are open.

Steam, properly enclosed

A sealed, fully tiled enclosure with a gently sloped ceiling so condensate runs to the wall rather than dripping on you.

Generator sized to room volume

Heated floors on a timer

An electric mat under porcelain with a programmable thermostat, so the floor is warm before the alarm goes off.

Runs about two hours a day

Rainfall and handheld together

A ceiling-mounted head for standing under and a handheld on a slide bar for everything else, on separate controls.

Two valves, no compromise

Niche lighting that stays dry

Low-voltage strip set into the top of the shower niche, sealed behind the tile line and warm enough to read by.

2700K, dimmable

Ventilation you can leave running

A fan rated under one sone, ducted to the outside in rigid pipe, on a humidity sensor rather than the light switch.

Mirrors clear in four minutes

A towel warmer worth the wall

Hardwired ladder rail on the same schedule as the floor, placed within arm's reach of the shower opening.

Shares the floor thermostat

A glass-panelled walk-in shower with a rainfall head and a recessed, lit niche

Flood-tested for 24 hours

02

Water is the point, so we measure it

A bathroom that wastes water is a bathroom that was specified carelessly. Every fixture we fit is flow-checked and written down before handover.

1.5

Gallons per minute

Our standard shower head spec, down from the 2.5 gpm most older homes still run.

2,700

Gallons saved a year

Typical two-person household after a valve and head replacement (sample figure).

1.28

Gallons per flush

WaterSense-rated toilets as standard, with a dual-flush option on request.

100%

Fixtures flow-tested

Every head, valve and tap is flow-checked and recorded before we hand the room back.

Figures are sample values based on our standard specification. Actual savings depend on the fixtures being replaced and household use.

03

Studio swatches

Four ways to lay the same tile

Pattern changes a small bathroom more than colour does. Here is what each layout costs in labour and what it does to the room.

Stacked tile layout shown as a full-size studio swatch

Stacked

Tiles aligned in a strict grid, vertical joints running floor to ceiling. The quietest pattern we install and the one that makes a small room feel taller.

  • Needs very flat walls, because every joint lines up and any bow is obvious
  • Vertical stacking adds perceived height; horizontal stacking adds width
  • Works best with rectified tile and a tight 1/16 inch joint
Labour
Fastest to set
Best in
Small hall baths, shower walls to the ceiling
Grout
Match the tile within one shade

04

The Montford bath, before and after

Drag the handle. The parts that took the longest are the ones neither photograph shows.

The Montford bathroom mid-demolition with the shower pan removedBefore
The finished Montford bathroom with handmade ceramic tile and the original hex floorAfter
  1. Before

    A 1980s mortar shower pan over felt, leaking quietly into the dining room ceiling below.

  2. Structure

    Subfloor replaced across the wet area and the waste line re-hung to a correct fall.

  3. Waterproofing

    Bonded membrane with banded corners, then a 24 hour flood test photographed at both ends.

  4. After

    Handmade ceramic in a running bond, original 1923 hex floor lifted, cleaned and reset.

05

Three ways to remodel a bathroom

Most enquiries land in one of these three. The honest difference is how much of the room comes out, not how nice the tile is.

Comparison of a refresh, a full bathroom remodel and an ensuite rebuild
DetailRefreshSame footprint, new wet area.Full remodelMost requestedDown to the studs and back.EnsuiteA larger room, planned around two routines.
Typical budget$9,800 - $18,500$24,000 - $52,000$32,000 - $78,000
Time on site9 - 12 days3 - 5 weeks4 - 7 weeks
How far we goTub out, tiled shower in, no walls movedEverything out to framing, layout adjustableReplanned inside the footprint, wet area separated
PlumbingAdapted to the existing drain and valve positionSupply and waste renewed, fixtures relocated where it helpsNew manifold runs, thermostatic valves, optional steam
WaterproofingNew bonded pan, flood-tested overnightFull wet area membrane, banded corners, 24 hour testFull enclosure including a sealed, sloped ceiling
FloorExisting floor kept, or re-tiled as an add-onLevelled, heated and re-tiled floor to ceilingHeated large-format porcelain or slab stone
LightingNew fixture and a quiet ducted fanTwo circuits plus a humidity-sensed fanThree dimmable circuits and a floor-level night light
GlassOne fixed panelFixed panel or hinged doorLow-iron enclosure to the ceiling
Best forA bathroom that works but looks tiredLayout, drainage or subfloor problemsTwo people sharing one bathroom every morning
Learn moreRead the detailRead the detailRead the detail

06

Walk through a finished bathroom

The portfolio is the fastest way to understand how we work. Start with the Vanderbilt Road ensuite.

A bright ensuite with a separated wet area behind a single run of glassCase studyVanderbilt Road ensuite, Biltmore ForestSeven weeks · Steam shower · Book-matched marble
  • Six rooms, start to finish

    Every case study carries the real scope, the real timeline and a sample budget figure.

  • What we found behind the wall

    Each project lists the four things that were wrong before we started and what we did about them.

  • The material list

    Tile, stone, glass and fixture choices named, so you can ask for the same thing.

A finished bathroom by Still Water Bath Co.

Next step

Tell us about the room

Send us a photograph and the rough dimensions. We will come back with an honest budget range before anyone books a visit.

Free measured survey · Fixed written proposal · Bathrooms only

07

Forty minutes from the studio, no further

We keep the radius tight so the crew is on site by eight and material runs take twenty minutes, not an afternoon.

09

Questions we are asked every week

If yours is not here, call the studio. We would rather answer it now than have you guess.

Talk to the studio

(828) 555-0211

Mon - Thu 8:00 am - 5:00 pm

All questions

As a sample range, a tub-to-shower conversion runs $9,800 to $18,500, a full hall bath remodel $24,000 to $52,000, and a primary ensuite $32,000 to $78,000. The variables that move those numbers most are whether plumbing relocates, how complex the tile pattern is, and what we find behind the walls. Every figure on this site is illustrative.

Nine to twelve days for a conversion, three to five weeks for a full remodel, four to seven weeks for a larger ensuite. You get a week-by-week schedule at the pre-construction meeting and a photo update every Friday.

Yes, and we plan around it. We sequence the toilet so you lose it for a single day rather than the whole project, and we can arrange a temporary unit for the days when the floor is open.

Non-negotiable in our work. Every bathroom we finish gets a fan sized to room volume, ducted in rigid pipe to the exterior, and wired to a humidity sensor rather than the light switch.

Only bathrooms. No kitchens, no additions, no whole-home renovations. It is a narrow shop on purpose: the same crew builds the same kind of room every week, so the details stop being decisions and start being habits.

A written workmanship warranty on our installation, plus manufacturer warranties on everything we supply, collected in a care folder at handover. We return at twelve months to check grout, sealant and glass hardware.

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.